Torch Lighter Butane Refillable Triple Jet Flame Torch Lighters, Windproof Adjustable Flame Butane Torch Lighter with Punch 2 Pack (Without Fuel)

Brand: TOPKAY Sold By: Everymarket
$68.10 In Stock
Ships from United States Arrives in 10-17 business days
Item can be returned in its original condition for a full refund or replacement within 30 days of receipt.
Delivery:
09
July2026
-
20
July2026
delivery Delivery Guarantee arrow
check$5 Credit If Delayed
checkFull Refund If Item Is Damaged
check15-Day Full Refund If No Updates
check30-Day Full Refund If Not Delivered
Torch Lighter Butane Refillable Triple Jet Flame Torch Lighters, Windproof Adjustable Flame Butane Torch Lighter with Punch 2 Pack (Without Fuel)

Torch Lighter Butane Refillable Triple Jet Flam...

$68.10

Product Details
  • TRIPLE FLAME TORCH LIGHTER: This Windproof Butane Lighter Torch Consist of 3 Burners, High Quality Triple Jet Flame Produce Strong and Powerful Jet Flame, Which Works Very Well Even in Windy Conditions with an Effective and Hot Flame.
  • SAFE AND RELIABLE: This Butane Lighter Nozzle with Copper Material was Designed for Supporting Continuously Flame and Longer Using Times, Cooling Hole and Ceramic Port Was Designed For Maximum Heat Dissipation to Prevent Damage Caused by High Temperature.
  • VISIBLE FUEL TANK: This Refillable Butane Lighter has 3.6g Capacity Fuel to Ensure Long Last Using. With Visible Fuel Level Window, Which Will Remind you When your Lighter Needs to Refill and Check the Status of Butane Refilling. Useful and Convenient.
  • EASY BUTANE ADJUSTMENT: This Adjustable Flame Torch Lighter Has a Manual Open Safety Cap (Attached) - Large Butane Adjustment Wheel, Which Makes it More Easier and Convenient to Adjust the Flame Height.
  • UTILITY TORCH LIGHTER: This Torch Lighter has a 2300F Flame, Strong Enough for any Task. Great for Lighting your Candles, Fireworks, Grill, BBQ. Also Suitable for Camping, Hiking. Works at any Angle, Even Upside Down.

  • Color: Black
  • Manufacturer: TOPKAY
  • Model Number: TK-23BK
  • Part Number: TK-23BK
  • Style: Classic

** REMEMBER: In Compliance with DOT Regulations-Butane Fuel is Not Included,Please Refill it before Using. **

Torch Lighter, Butane Lighter, Refillable Triple Jet Flame Torch Lighters, Windproof Adjustable Flame Butane Lighter for Candles, Grill, Fireworks,Camping, 2Pack (Without Butane)

HOW TO REFILL TORCH LIGHTER

Bleed the Lighter
Bleed the Lighter, Release All Tank Pressure by Pressing the Refill Inlet Valve with a Small Screwdriver until No Hissing Sound Heard. Air Inside the Fuel Tank Prevents Butane from Being Injected into the Tank.

Set Flame Height Adjustment
In order to Prevent an Unexpectedly High Flame after Refilling. Turn the Flame Height Adjuster on the Bottom of the Lighter to the Lowest Setting by Turning the Flame Adjustment Wheel Clockwise.

Filling Tank with Butane
Hold the Lighter and Butane Can in an Vertical upside-down Position. Press the Stem of the Butane Can into the Refill Valve in 5-second Bursts to Inject the Butane.

Wait a Few Minutes
Before Igniting the Lighter, Please Wait 3-4 Minutes, this Allow the Excess Butane to Evaporate and Fuel Inside Lighter to Reach Room Temperature.

Test the Lighter
Turn the Flame Adjustment Wheel 1/2 turn Counter Clockwise, Attempt the Light the Lighter. If the lighter won’t Light, Turn the Adjustment Wheel Another 1/4 turn and Try again. Keep Adjusting the Flame Adjustment Wheel until the Flame Reaches the Desired Level

WARNING

KEEP AWAY FROM CHILDREN
Refill/Empty only in a well ventilated area.
Never attempt to refill or empty near any heat source, sparks or flame.
No smoking during refilling or emptying.
Do not keep it igniting for more than 10 seconds

Shipping Summary:

We currently ship exclusively to addresses within the Canada.

Standard International Shipping from the United States to Canada costs CAD 14.99.

Shipping Time & Methods

Estimated Delivery Time: 10–15 business days
This total includes both processing and transit times.

  • Processing Time: All orders are processed and dispatched within 1–3 business days of purchase.

  • International Transit (US to Canada):
    Orders are initially shipped via FedEx from our U.S.-based fulfillment centers.
    Average international transit time is 4–8 business days.

  • Domestic Delivery within Canada:
    Once the shipment arrives in Canada, it is handed over to Canada Post or UPS for final delivery.
    Canada domestic delivery typically takes an additional 2–4 business days.

Shipping times may vary depending on the product’s fulfillment center and any customs processing that may be required.

Please note that while most packages arrive within the estimated timeframe, unexpected delays may occur due to factors such as customs inspections, public holidays, weather disruptions, or other unforeseen circumstances. Delivery dates are not guaranteed, as final transportation is managed by third-party carriers.


Tracking Information

You will receive a tracking number via email once your order has been dispatched.
Products may be shipped from different fulfillment centers depending on availability and inventory levels.


Delivery Information

Orders are delivered directly to most addresses within Canada, with the exception of P.O. boxes.

In certain remote or rural areas, additional delivery fees may apply. In such cases, you may be required to collect your parcel from the nearest shipping partner’s location.

Overview

We want you to be satisfied with your purchase. Please review our refund and return policy to understand how to proceed if you need to return an item or request a refund.


Order Cancellations

Canceling Your Order Before Shipping:
You can cancel your order within 2 hours of placing it. To do so:

  1. Log in to your account and cancel the order directly.

  2. Alternatively, email us immediately at cs@everymarket.ca with your order details.

If More Than 2 Hours Have Passed:
If it's been more than 2 hours since you placed your order, you will need to contact our customer service team for assistance. Please email us at cs@everymarket.ca with your order details.

Once Your Order Has Shipped:
Unfortunately, we cannot cancel orders once they’ve been shipped. In that case, you can return the item by following our return process.


Return Policy

Return Period: You have 30 days from the date of delivery to request a return.
Item Condition: Products must be unused, unwashed, and in their original packaging with all tags attached.
Return Shipping Costs: Customers are responsible for return shipping fees unless the item is defective.
Return Approval: Returns must be approved before sending items back. Contact us at cs@everymarket.ca to begin the process.


How to Initiate a Return

  1. Contact our support team at cs@everymarket.ca with your order number and reason for the return.

  2. If approved, we will provide a return shipping label and detailed instructions.

  3. Pack the item securely and send it back using a trackable shipping method.

  4. Once received and inspected, we will process your refund or exchange.


Defective or Damaged Products

If you receive a defective, damaged, or incorrect item, please contact us immediately.
Return Eligibility: Used defective items may be returned if the defect is confirmed.
Shipping Costs: We will cover the return shipping cost for defective or incorrect items.
Refund: A full refund, including original shipping costs, will be issued for defective items.


Returns for Customer Remorse (Changed Mind, Wrong Item Ordered)

Eligibility: Items may be returned within 30 days if they are unused and in their original condition.
Shipping Costs: Customers are responsible for return shipping fees.
Refund: Original shipping costs are non-refundable for remorse-based returns.


Items Not Eligible for Return

  • Electronic devices after 30 days (e.g., laptops, tablets, Kindles)

  • Gift cards and prepaid game cards

  • Perishable goods, some jewelry, and personal care items

  • Customized or personalized products

  • Items with special shipping restrictions


Refund Process

Processing Time: Refunds are issued within 3-5 business days after we receive and inspect the returned item.
Refund Method: Refunds are credited to the original payment method or as store credit for purchases made with gift cards.
Bank Processing: Please allow additional time for your bank to process the refund.


Exchanges

To exchange an item quickly, return the original product and place a new order for the replacement.


Return Address

EveryMarket Customer Service

Address: 46 Darnborough Way, City: Scarborough, Province: Ontario, Post code: M1W 2G1


Customer Support

Our support team is available 24/7 for any questions or assistance.
📧 Email: cs@everymarket.ca

  • TRIPLE FLAME TORCH LIGHTER: This Windproof Butane Lighter Torch Consist of 3 Burners, High Quality Triple Jet Flame Produce Strong and Powerful Jet Flame, Which Works Very Well Even in Windy Conditions with an Effective and Hot Flame.
  • SAFE AND RELIABLE: This Butane Lighter Nozzle with Copper Material was Designed for Supporting Continuously Flame and Longer Using Times, Cooling Hole and Ceramic Port Was Designed For Maximum Heat Dissipation to Prevent Damage Caused by High Temperature.
  • VISIBLE FUEL TANK: This Refillable Butane Lighter has 3.6g Capacity Fuel to Ensure Long Last Using. With Visible Fuel Level Window, Which Will Remind you When your Lighter Needs to Refill and Check the Status of Butane Refilling. Useful and Convenient.
  • EASY BUTANE ADJUSTMENT: This Adjustable Flame Torch Lighter Has a Manual Open Safety Cap (Attached) - Large Butane Adjustment Wheel, Which Makes it More Easier and Convenient to Adjust the Flame Height.
  • UTILITY TORCH LIGHTER: This Torch Lighter has a 2300F Flame, Strong Enough for any Task. Great for Lighting your Candles, Fireworks, Grill, BBQ. Also Suitable for Camping, Hiking. Works at any Angle, Even Upside Down.

  • Color: Black
  • Manufacturer: TOPKAY
  • Model Number: TK-23BK
  • Part Number: TK-23BK
  • Style: Classic

** REMEMBER: In Compliance with DOT Regulations-Butane Fuel is Not Included,Please Refill it before Using. **

Torch Lighter, Butane Lighter, Refillable Triple Jet Flame Torch Lighters, Windproof Adjustable Flame Butane Lighter for Candles, Grill, Fireworks,Camping, 2Pack (Without Butane)

HOW TO REFILL TORCH LIGHTER

Bleed the Lighter
Bleed the Lighter, Release All Tank Pressure by Pressing the Refill Inlet Valve with a Small Screwdriver until No Hissing Sound Heard. Air Inside the Fuel Tank Prevents Butane from Being Injected into the Tank.

Set Flame Height Adjustment
In order to Prevent an Unexpectedly High Flame after Refilling. Turn the Flame Height Adjuster on the Bottom of the Lighter to the Lowest Setting by Turning the Flame Adjustment Wheel Clockwise.

Filling Tank with Butane
Hold the Lighter and Butane Can in an Vertical upside-down Position. Press the Stem of the Butane Can into the Refill Valve in 5-second Bursts to Inject the Butane.

Wait a Few Minutes
Before Igniting the Lighter, Please Wait 3-4 Minutes, this Allow the Excess Butane to Evaporate and Fuel Inside Lighter to Reach Room Temperature.

Test the Lighter
Turn the Flame Adjustment Wheel 1/2 turn Counter Clockwise, Attempt the Light the Lighter. If the lighter won’t Light, Turn the Adjustment Wheel Another 1/4 turn and Try again. Keep Adjusting the Flame Adjustment Wheel until the Flame Reaches the Desired Level

WARNING

KEEP AWAY FROM CHILDREN
Refill/Empty only in a well ventilated area.
Never attempt to refill or empty near any heat source, sparks or flame.
No smoking during refilling or emptying.
Do not keep it igniting for more than 10 seconds

Shipping Summary:

We currently ship exclusively to addresses within the Canada.

Standard International Shipping from the United States to Canada costs CAD 14.99.

Shipping Time & Methods

Estimated Delivery Time: 10–15 business days
This total includes both processing and transit times.

  • Processing Time: All orders are processed and dispatched within 1–3 business days of purchase.

  • International Transit (US to Canada):
    Orders are initially shipped via FedEx from our U.S.-based fulfillment centers.
    Average international transit time is 4–8 business days.

  • Domestic Delivery within Canada:
    Once the shipment arrives in Canada, it is handed over to Canada Post or UPS for final delivery.
    Canada domestic delivery typically takes an additional 2–4 business days.

Shipping times may vary depending on the product’s fulfillment center and any customs processing that may be required.

Please note that while most packages arrive within the estimated timeframe, unexpected delays may occur due to factors such as customs inspections, public holidays, weather disruptions, or other unforeseen circumstances. Delivery dates are not guaranteed, as final transportation is managed by third-party carriers.


Tracking Information

You will receive a tracking number via email once your order has been dispatched.
Products may be shipped from different fulfillment centers depending on availability and inventory levels.


Delivery Information

Orders are delivered directly to most addresses within Canada, with the exception of P.O. boxes.

In certain remote or rural areas, additional delivery fees may apply. In such cases, you may be required to collect your parcel from the nearest shipping partner’s location.

Overview

We want you to be satisfied with your purchase. Please review our refund and return policy to understand how to proceed if you need to return an item or request a refund.


Order Cancellations

Canceling Your Order Before Shipping:
You can cancel your order within 2 hours of placing it. To do so:

  1. Log in to your account and cancel the order directly.

  2. Alternatively, email us immediately at cs@everymarket.ca with your order details.

If More Than 2 Hours Have Passed:
If it's been more than 2 hours since you placed your order, you will need to contact our customer service team for assistance. Please email us at cs@everymarket.ca with your order details.

Once Your Order Has Shipped:
Unfortunately, we cannot cancel orders once they’ve been shipped. In that case, you can return the item by following our return process.


Return Policy

Return Period: You have 30 days from the date of delivery to request a return.
Item Condition: Products must be unused, unwashed, and in their original packaging with all tags attached.
Return Shipping Costs: Customers are responsible for return shipping fees unless the item is defective.
Return Approval: Returns must be approved before sending items back. Contact us at cs@everymarket.ca to begin the process.


How to Initiate a Return

  1. Contact our support team at cs@everymarket.ca with your order number and reason for the return.

  2. If approved, we will provide a return shipping label and detailed instructions.

  3. Pack the item securely and send it back using a trackable shipping method.

  4. Once received and inspected, we will process your refund or exchange.


Defective or Damaged Products

If you receive a defective, damaged, or incorrect item, please contact us immediately.
Return Eligibility: Used defective items may be returned if the defect is confirmed.
Shipping Costs: We will cover the return shipping cost for defective or incorrect items.
Refund: A full refund, including original shipping costs, will be issued for defective items.


Returns for Customer Remorse (Changed Mind, Wrong Item Ordered)

Eligibility: Items may be returned within 30 days if they are unused and in their original condition.
Shipping Costs: Customers are responsible for return shipping fees.
Refund: Original shipping costs are non-refundable for remorse-based returns.


Items Not Eligible for Return

  • Electronic devices after 30 days (e.g., laptops, tablets, Kindles)

  • Gift cards and prepaid game cards

  • Perishable goods, some jewelry, and personal care items

  • Customized or personalized products

  • Items with special shipping restrictions


Refund Process

Processing Time: Refunds are issued within 3-5 business days after we receive and inspect the returned item.
Refund Method: Refunds are credited to the original payment method or as store credit for purchases made with gift cards.
Bank Processing: Please allow additional time for your bank to process the refund.


Exchanges

To exchange an item quickly, return the original product and place a new order for the replacement.


Return Address

EveryMarket Customer Service

Address: 46 Darnborough Way, City: Scarborough, Province: Ontario, Post code: M1W 2G1


Customer Support

Our support team is available 24/7 for any questions or assistance.
📧 Email: cs@everymarket.ca

Oops!

Sorry, it looks like some products are not available in selected quantity.

OK